The Property Development Committee (PDC) works alongside owners who are ready to build a new home or renovate an existing one. Our goal is simple: help you realize your vision while protecting what makes La Misión special.

La Misión has building rules, and every project must follow them. They apply to new construction, rebuilds, additions, and renovations alike, and no construction may begin without the proper approvals and permits.

Why the rules exist

Residents have told us what they value most about living here. The building regulations are designed to protect it, for current neighbors and for you once you’ve joined them.

Manageable density

Guarding against unchecked, chaotic growth that would strain roads, water, and shared infrastructure.

Views & charm

Protecting the ocean, estuary, and valley views and the community character that draw people here.

Property values

Ensuring proper building codes and housing standards are followed across the whole community.

Key building rules at a glance

This is a summary. The full Building Regulations & Guidelines contain the details, including special height rules for downhill, uphill, and La Playa beachfront lots.

One home per lot

  • Lots cannot be subdivided.
  • One house per lot. Some lots may allow a small guest casita with bedrooms and bathrooms, but not a kitchen or other infrastructure for permanent living.
  • Variances are considered case by case.

Height & views

  • Maximum two stories and 7.0 meters total, including pergolas, parapets, and anything on the roof.
  • Downhill lots have a lower limit at road level to protect the views of neighbors uphill.
  • Beachfront lots on La Playa have their own modified height limits.

Setbacks

  • Front: at least 3.0 meters
  • Each side: at least 1.5 meters
  • Rear: at least 2.0 meters

Parking & trash

  • At least one off-road parking space is required. We suggest planning for more, since our roads are narrow.
  • An enclosed trash area for at least two cans is required.

Drainage

  • Plans must not send runoff onto lower neighboring lots.
  • No gray water or other contaminated water may leave your lot onto another property or common area.

Not permitted

  • Swimming pools. Because of our water supply limits, the Water Company will not provide water to a property whose plans include a pool.
  • Livestock of any kind.
  • RVs, motor homes, or trailers as permanent living space.

How the process works

Control Urbano treats rebuilds and additions as new construction, so the same pre-construction steps apply to nearly every project. Building licenses are issued through Desarrollo Urbano, and Control Urbano looks for LMPOA’s approval as part of its review.

1

Get oriented and reach out

Read the Building Regulations & Guidelines, then submit the PDC Request for Construction (or send us a note through the contact form). This is the first formal step.

2

Set up water service

Apply for an account with the La Misión Water Company and sign its service contract, with payment of installation charges and the prorated annual fee. The Water Company requires evidence of your current LMPOA dues.

3

Sign the PDC agreement and submit plans

Sign the PDC Construction Agreement and provide your licensed architect’s complete plans for review. Original plans are required, not photocopies.

4

Plan acceptance, fee, and bond

Once the PDC accepts your plans, we collect a $250 non-refundable processing fee and a $2,500 refundable bond. The bond is returned in full when your project is completed as agreed.

5

Water certification and building permit

The Water Company issues a letter certifying its commitment to provide service, which Control Urbano requires before issuing your building permit. Once you have the stamped permit, resubmit it to the Water Company to begin the water service process.

6

Build respectfully

Construction may begin only once a valid permit is issued. Please see the job-site expectations below.

7

Finish and close out

Deliver your Certificate of Occupancy to the PDC. Your contractor repairs any damage to roads or common property and clears all debris, leaving the area as they found it. Your bond is then returned, and our oversight ends.

Being a good neighbor during construction

Work hours

  • Monday–Friday: 8 AM–5 PM
  • Saturday: 8 AM–1 PM
  • Crews may enter from 7:45 AM to set up.

Job-site standards

  • Porta-potty and trash containers on site, with daily cleanup.
  • No loud radios or excessive noise.
  • Materials stay on the property, never on the roadway.

Keeping roads open

  • Equipment on the road must leave at least one lane open.
  • If the road must be blocked, give the property manager at least 2 days’ notice, stay with your equipment, and be ready to clear a path quickly for emergencies.
  • No equipment left on community roads overnight.

Let’s talk about your project

Whether you’re sketching your first idea or already working with an architect, the PDC is happy to help. Get in touch early, and we’ll point you in the right direction. If you’re building, the La Misión Water Company requires that you work with the PDC before construction begins and become an LMPOA member to qualify for water service.